Global edition · USA head office, Folsom, CA · +1 916 260 1676

India edition

Plans Global logo Plans Global DDEX Solutions

How it works

Onboarding a feed in 7 to 10 days, without shortcuts

The timeline is short because the sequence is fixed and each phase has a clear exit condition. Here is the sequence, what we need from your team, and what changes once the feed is live.

How long does onboarding take?

Typically 7 to 10 days from kickoff to the first live delivery. The variable is usually turnaround on your side: sample data, test assets and sign-offs. Our own work in each phase is scheduled from day one.

That window assumes releases are ready to ship and rights are cleared. If your back catalog needs significant cleanup, new releases can still go live inside the window while historical material is remediated in parallel. We would rather surface that in the first week than discover it at go-live.

What are the onboarding phases?

Five phases: discovery, data audit, mapping, test deliveries and go-live. Each ends with something concrete you can review, so progress is visible rather than implied.

  1. Discovery

    A working session, by email, WhatsApp or a call to our USA office line, covering release volume, destinations, current ERN version or provider, and known pain points. Exit condition: a shared understanding of scope and a custom quote in USD.

  2. Data audit

    We review a representative metadata export and a handful of finished releases. Typical findings include inconsistent artist names, missing writer credits, recycled ISRCs across versions of a track, and date fields that contradict each other. Exit condition: a written findings list with the store-side consequence of each item.

  3. Mapping

    Your fields, or your platform's data model, are mapped to ERN elements per destination. Decisions are recorded: display artist conventions, featured-artist handling, label and imprint naming, territory defaults. Exit condition: an approved mapping document.

  4. Test deliveries

    Selected releases run through the full chain. Where a destination offers a test environment or requests samples, those are used first. Responses are reconciled and the mapping adjusted until results are clean. Exit condition: clean acknowledgments for the test set.

  5. Go-live

    The first production release ships with your sign-off and is tracked to acceptance. Exit condition: confirmed acceptance, and a handover into ongoing operations.

What do we need from your team?

One decision-maker for metadata questions, a sample export, two or three finished test releases, your destination and territory list, and for integrations, a technical contact.

  • Label and imprint names exactly as stores should display them
  • A metadata export: titles, artists, contributors, ISRCs, UPCs, dates, genres
  • Lossless audio and cover art for the test releases
  • Rights territories, including any exclusions
  • For integrations, access to a staging environment if one exists

What does ongoing operation look like?

Releases flow in through the agreed route, pass through validation, ship in each destination's version and are reconciled to acceptance. You hear from us when a release is accepted, when a decision is needed, and when something failed and what we did about it.

On a routine day, new releases are checked as they arrive. Anything that fails a content check returns to you immediately with a precise reason, for example: "Track 2 lists a featured artist inside the title; two destinations will reject or rewrite it." Releases that pass are generated, validated against the schema and queued ahead of street date.

Acknowledgments are processed every business day. A failure is never simply forwarded. It is traced to the responsible field or rule, corrected where the fix is mechanical, and redelivered. Only fixes that need a business decision, such as which spelling of a contributor's name is canonical, come back to your team.

How far ahead should releases be delivered?

Earlier is always safer. Every destination has its own processing time, and busy release periods, such as the run-up to the holiday season or the start of a calendar year, add pressure. We flag any release whose street date looks tight for a particular destination.

How are corrections and takedowns handled?

As update messages tied to the original identifiers. That ensures stores modify or withdraw the existing product instead of creating a second one.

Send the change request and we prepare it per destination and per ERN version. Typical requests include a corrected contributor credit, replacement artwork, a revised territory list, a new street date before release, or a full takedown. Each is tracked to acknowledgment just like a new release.

What happens if a destination still rejects a release?

We identify the cause from the response, correct it and redeliver. If the cause is a policy decision rather than a data problem, we explain the destination's position and the available options.

The pattern of rejections over time is also useful information. If the same rule keeps triggering, we fix the cause upstream, in the intake template, the mapping or the validation rules, so it stops recurring. Common cases are answered in our FAQ, and the broader service is described on the solutions page.

Scope your feed with an engineer, not a sales script.

Tell us your destinations, monthly volume and current ERN version. We reply with questions that matter and a custom quote in USD.